



This industrial zone occupies more than 40000m2 for the new cement building, the silos are covered inside the building for production, with a truss space structure for the delivery and storage of raw materials.
The roof and wall are used with PPGI galvanized steel sheets, corrugated type for better appearance, off-white color as cement plant show.
| Number | Item | Details |
| 1 | Turnkey project | Yes: Design+Material+Installation for industrial area |
| 2 | Area | 40000m2 |
| 3 | Structure | Space structure + portal structure + frame structure |
| 4 | External roof | PPGI sliver steel cladding sheet |
| 5 | External wall | PPGI sliver steel cladding sheet |
| 6 | Door | Porte industrielle upford, porte en acier |
| 7 | Construction time | 2020.7-2020.9 |